This is a Gnd+1 Villa was built in 285 m2, the executed job was just the renovation work. The project duration was 5 months.
This site was built in 250 m2; the executed job was skeleton for Gnd+3. The project duration was 5 months.
This is an under construction site consist of Gnd+2, the built area was 278 m2.
This site was built in 330 m2; the executed job was skeleton for ground floor. The project duration was 3 months.
This is a duplex (Two Stories) flat built in 130. The scope was finishing & interior design.
This is a G+3 Villa was built in 450 m2, the executed job was skeleton and finishing work for second and third floor, exterior design and finishing. The project duration was 15 months.
This is a Triplex (Three stories) flat built in 120 . The scope was finishing & interior design.
This is a G+2 Villa was built in 400 m2, the executed job was just the renovation work. The project duration was 3 months.
This is a project of 5848m2 Gable frame undertaken on Design & Build basis. The work started on September 2010 and finished on February 2011 with total value of 1,783,640 SDG.
This is a warehouse project of 1261m2 Gable frame. The work started on August 2010 and finished on February 2011
This building consists of Basement + Ground floor; building area is 270 m2 with free span of 14m.
This is a gable frame showroom designed by Arch. Qusai Osman